Machine Room Commissioning, Start-up Sequence, Acceptance Checklist & Operation Log

Machine room commissioning is the final verification of the whole refrigeration system after installation, before formal handover. Standard start-up sequence: visual inspection → leak test → vacuum → refrigerant charging → oil check → single component test → load running. Leak test: pressurize with dry nitrogen, hold pressure and detect leak; vacuum target below 500 microns for POE oil system. Charging: charge liquid refrigerant into receiver side; never charge liquid directly into compressor suction port. Commissioning key parameters: superheat, subcooling, condensing pressure, suction pressure, oil level, defrost termination temperature. Xiteliduo provides commissioning checklist, operation manual and alarm troubleshooting document together with equipment. Acceptance items: temperature stability, pull-down time, running current, noise, vibration, all alarm function test. Operation log record: daily room temperature, pressure, ambient temperature, running hour, alarm event and maintenance action. Training for end user: normal operation, alarm judgment, forbidden operation, safe pump down procedure and refrigerant handling. Handover standard: all test data recorded, drawings updated as-built, spare parts list submitted. Refrigeration maintenance & repair company recommends 72 hours continuous load running test before final acceptance.

FAQ

  1. What is the correct order before refrigerant charging? Pressure leak test and vacuum pumping.
  2. What is the vacuum target for POE oil system? Below 500 microns.
  3. Where to charge liquid refrigerant? Receiver side.
  4. What core parameters need recording during commissioning? Superheat, subcooling, suction and condensing pressure.
  5. How long is the suggested continuous load test? 72 hours.
  6. What log content should be recorded daily? Temperature, pressure, running hours and alarms.
  7. What must be tested before acceptance? All protection and alarm functions.
  8. What document should be handed over to customer? As-built drawing, manual, checklist and spare part list.
Website dieses Artikels: https://de.xtldcool.com/news/835.html

Produktanpassungspläne online abrufen

Bitte geben Sie die erforderlichen Angaben in das untenstehende Feld ein, dann können Sie es kostenlos erhalten.

Beratungshotline

+86-18157593311

Xiteliduo & Chuanli

Chinesischer Hersteller von halbhermetischen R32-Kolbenkompressoren und maßgeschneiderten, schlüsselfertigen industriellen Kälteanlagen. Selbst entwickelte Kompressoren + komplette Kältelösungen, stabile Leistung unter tropischen und extrem niedrigen Betriebstemperaturen.

Verbinden Sie uns

Technischer Kundendienst: +86-575-83665888; 83068555 
Hotline für Kompressoren: +86-18157593311 
Hotline für elektrische Heizrohre: +86-13857577938 
E-Mail: helenliu1983xtld@gmail.com 
Werk für elektrische Heizrohre: Nr. 150, Donghu Village, Ganlin Town, Shengzhou City, Shaoxing City 
Werk für Kompressoren: Nr. 679, Dongguo Economic Development Zone, Shengzhou City, Shaoxing City

Copyright © 2026 Zhejiang Xitelidu Environmental Technology Co., Ltd. & Shengchuanli Environmental Technology Co., Ltd. Alle Rechte vorbehalten.